A solar atta chakki runs your flour mill on sunlight instead of diesel or grid power. Panels on the roof feed a solar VFD, the VFD runs the motor, and the grid tops up only when the sun is low. No battery is needed for daytime milling.
How a solar atta chakki works
Solar panels generate DC. The solar VFD tracks the maximum power point and converts it to a variable-frequency three-phase output for the mill motor. Above roughly 586 V DC the drive runs on solar alone; below that it blends 415 V grid power automatically. Starting is soft, so the belt and bearings are not shocked.
Sizing table
Array sizes below follow Crompton Greaves VFD ratings we supply. Panel counts assume 620 Wp modules.
| Motor | Solar VFD | Array | Panels (620 Wp) | Typical daily milling |
|---|---|---|---|---|
| 7.5 HP | VSR50-013 | 8.25 kWp | 14 | 4–6 hours |
| 10 HP | VSR50-017 | 11 kWp | 18 | 4–6 hours |
| 15 HP | VSR50-024 | 16.5 kWp | 27 | 5–7 hours |
| 20 HP | VSR50-032 | 22.5 kWp | 37 | 5–8 hours |
| 25 HP | VSR50-038 | 27.5 kWp | 45 | 6–8 hours |
| 30 HP | VSR50-045 | 33 kWp | 54 | 6–8 hours |
Indicative only. We confirm against your mill, motor nameplate and roof after a survey.
What a complete installation includes
- Solar panels and mounting structure
- Solar VFD matched to the mill motor
- DC and AC isolation, cabling and earthing
- Net metering application where applicable
- Commissioning and operator handover
- Service support from our Lucknow team
Cost and subsidy
Project cost depends on motor size, array size, structure height and cable runs. We quote after the survey rather than publishing a headline figure. For residential rooftop systems the PM Surya Ghar scheme may apply — eligibility and rates depend on capacity and application date, and we confirm them before you commit. Read about rooftop and subsidy here.
Why millers switch
The real comparison is diesel, not grid tariff. A mill running on a diesel engine pays for fuel every day; a solar atta chakki pays once and then runs on sunlight for the daytime shift. Grid power still covers night shifts and cloudy spells without a manual changeover.
Frequently asked questions
Do I need a battery for a solar atta chakki?
No, for daytime milling. The drive runs from the array and blends grid power when solar is low. A battery is only needed if you must mill during outages.
Can I run my existing mill motor on solar?
Usually yes, if it is a standard three-phase induction motor. We check the nameplate, insulation class and starting load before quoting.
What happens on a cloudy day?
The drive blends grid power automatically. You keep milling, at a lower solar share.
How much roof area is needed?
Roughly 100 sq ft per 620 Wp panel. A 15 HP system with 27 panels needs about 2,700 sq ft of usable, shade-free area.
Can it run other machines too?
The array can be sized to run a mill plus a pump or blower, but the drive must be matched to the largest motor and the starting sequence checked.
What warranty do I get?
12 months on the drive and 18 months on a drive plus motor combo, with service by Crompton Greaves. Panel warranty follows the manufacturer.
Availability in Lucknow and across UP
We survey, design and install solar atta chakki systems from Lucknow across Uttar Pradesh. Send your motor nameplate, a roof photo and your monthly milling hours, and we will size the array and drive before you commit.
WhatsApp for a solar atta chakki quote Send a project enquiry
Hindi summary
सोलर आटा चक्की आपकी चक्की को धूप से चलाती है। छत पर सोलर पैनल, सोलर VFD और आपका मोटर — दिन में सोलर से, धूप कम होने पर ग्रिड से अपने आप। बैटरी की जरूरत नहीं। मोटर की नेमप्लेट भेजें, हम सिस्टम साइज और कीमत बता देंगे।